Hospitality
 

San Francisco Hilton, San Francisco, CA

Air Handler retrofit using FANWALL TECHNOLOGY®

  • Aging 47,800 cfm air handler serving four ballroom foyers needed to be replaced.
  • Proposed solution called for four air handlers (one per zone), but access and budget concerns required a better solution.
  • FANWALL system provided the ideal solution by allowing the existing fan system to be replaced in place along with coils, dampers and other components.
  • The project was completed over 8 days without interruption of hotel guests or normal operations.  The installation of the FANWALL cubes was completed in approximately 2 hours.
  • Hotel operators now benefit from a much quieter system, redundancy to avoid downtime and energy savings that resulted in a $13,000 rebate from Pacific Gas & Electric.
  • Read our case study (PDF) or view the video version.

 

The Joint at the Hard Rock Hotel & Casino, Las Vegas NV

HUNTAIR® Air Handlers with FANWALL TECHNOLOGY®

  • A state-of-the-art concert venue seating up to 4000.
  • Supply and return fans inside air handlers are designed using FANWALL TECHNOLGY to provide reliability and redundancy:
    • Eight air handlers supply 142,500 cfm to the concert facility.
    • Six air handlers supply 104,000 cfm to the meeting rooms.
  • Redundant VFDs for both supply and return fans provide reliability and are used to vary airflow.
  • Read our case study (PDF)
The Joint at the Hard Rock Hotel & Casino, Las Vegas NV
The Joint at the Hard Rock Hotel & Casino, Las Vegas NV The Joint at the Hard Rock Hotel & Casino, Las Vegas NV