Careers
|
Contact Us
|
Home
|
News
|
Rep Login
About Us
Why CES Group
Why Custom
Our Companies
Eaton-Williams Group, Ltd
Governair, LLC
Huntair, Inc.
Mammoth, Inc.
Temtrol, LLC
Venmar CES, Inc.
Ventrol Air Handling Systems, Inc.
Products
CLEANPAK
Product Line
Eaton-Williams
Product Line
Governair
Product Line
HUNTAIR
Product Line
Mammoth
Product Line
Temtrol
Product Line
Venmar CES
Product Line
Ventrol
Product Line
Innovation
FANWALL TECHNOLOGY
About FANWALL
Benefits of FANWALL
What's New
Availability
Retrofits
Literature
Customer Solutions
Sound Lab
Green Design
Acoustics
Energy Efficiency
Indoor Air Quality
LEED
Solutions by Market
Education
Healthcare
Hospitality
Office
Other
Public Buildings
Retrofit & Renovation
Find a Rep
Search
Solutions by Market
>
Hospitality
Solutions by Market
Education
Healthcare
Hospitality
Office
Other
Public Buildings
Retrofit & Renovation
Hospitality
San Francisco Hilton, San Francisco, CA
Air Handler retrofit using FANWALL TECHNOLOGY
®
Aging 47,800 cfm air handler serving four ballroom foyers needed to be replaced.
Proposed solution called for four air handlers (one per zone), but access and budget concerns required a better solution.
FANWALL system provided the ideal solution by allowing the existing fan system to be replaced in place along with coils, dampers and other components.
The project was completed over 8 days without interruption of hotel guests or normal operations. The installation of the FANWALL cubes was completed in approximately 2 hours.
Hotel operators now benefit from a much quieter system, redundancy to avoid downtime and energy savings that resulted in a $13,000 rebate from Pacific Gas & Electric.
Read our case study
(PDF) or view the
video version
.
The Joint at the Hard Rock Hotel & Casino, Las Vegas NV
HUNTAIR
®
Air Handlers with FANWALL TECHNOLOGY
®
A state-of-the-art concert venue seating up to 4000.
Supply and return fans inside air handlers are designed using FANWALL TECHNOLGY to provide reliability and redundancy:
Eight air handlers supply 142,500 cfm to the concert facility.
Six air handlers supply 104,000 cfm to the meeting rooms.
Redundant VFDs for both supply and return fans provide reliability and are used to vary airflow.
Read our case study
(PDF)