Careers
|
Contact Us
|
Home
|
News
|
Rep Login
About Us
Why CES Group
Why Custom
Our Companies
Eaton-Williams Group, Ltd
Governair, LLC
Huntair, Inc.
Mammoth, Inc.
Temtrol, LLC
Venmar CES, Inc.
Ventrol Air Handling Systems, Inc.
Products
CLEANPAK
Product Line
Eaton-Williams
Product Line
Governair
Product Line
HUNTAIR
Product Line
Mammoth
Product Line
Temtrol
Product Line
Venmar CES
Product Line
Ventrol
Product Line
Innovation
FANWALL TECHNOLOGY
About FANWALL
Benefits of FANWALL
What's New
Availability
Retrofits
Literature
Customer Solutions
Sound Lab
Green Design
Acoustics
Energy Efficiency
Indoor Air Quality
LEED
Solutions by Market
Education
Healthcare
Hospitality
Office
Other
Public Buildings
Retrofit & Renovation
Find a Rep
Search
Solutions by Market
>
Office
Solutions by Market
Education
Healthcare
Hospitality
Office
Other
Public Buildings
Retrofit & Renovation
Office
Chicago Board of Trade – Chicago, IL
HUNTAIR
®
– Retrofit Using FANWALL TECHNOLOGY
®
Replacement of two fan systems providing 470,000 cfm to floors 10 to 23 of this historic building.
Modular fan array system using FANWALL TECHNOLOGY allowed contractors bring 72 fan cells up to the 23rd floor using a dolly. The cells were moved outside onto the sub-roof where they were hoisted onto a scaffolding catwalk and moved into the mechanical room on the 24th floor through a temporary hole in the wall.
Retrofit completed over weekends and holidays with little or no interruption to normal operations.
Tenants and building management now benefit from a much quieter system, redundancy to avoid downtime, and VAV control on each floor to improve overall system performance.
Read our case study
(PDF)
Transamerica Pyramid – San Francisco, CA
HUNTAIR
®
– Retrofit Using FANWALL TECHNOLOGY
®
Replacement of two air handler fans (101,000 cfm each) serving floors 1 to 18 that were beyond their service life and required continual maintenance.
Goals met with replacement included using the same space, minimum disruption to tenants, lower maintenance, a quieter system, better efficiency and redundancy to avoid downtime.
Modular fan system using FANWALL TECHNOLOGY allowed additional system changes to better improve system performance.
Energy consumption savings of 80,000 kWh resulted in an $11,000 rebate from Pacific Gas & Electric.
Read our case study
(PDF)
Systems Unlimited – Iowa City, IA
Venmar CES™ – Ground-Source Heat Pump
38,400 ft
2
office building and training facility.
Owner concerned with energy costs and indoor air quality.
Solution: 8,000 CFM, 30-ton Venmar CES integrated ground-source heat pump energy-recovery ventilator with ARI-certified total energy wheel air-to-air heat exchanger and three five-ton ground source heat pumps supplying ceiling mounted radiant ground-source heat pumps.
Read our case study
(PDF)
Tower Oaks, Rockville, MD
Governair
®
Custom Heat Recovery Unit
200,000 ft
2
office building.
First ground-up office building in the Washington region to achieve LEED
®
platinum rating.
The Governair custom designed HVAC system on this next generation building is 39% more efficient than standard office systems, contributing to an overall 28% reduction energy consumption.
This 4-stage air filtration system circulates 30% more outside air than required, making it capable of turning over the building’s air every 51 minutes and resulting in the removal of over 90% of airborne contaminants.
The Met Office, Exeter, UK
Eaton-Williams
®
Air Handlers, Chilled Water and DX units, and more
Virtually the entire Eaton-Williams product offering was used for the Met Office’s purpose-built, environmentally friendly building in Exeter.
To meet the building’s requirements for efficient cooling and optimal air distribution, no fewer than 20 Moducel LKS air handlers, 40 Moducel IPAC units (20 serving each IT hall), and Series 600 chilled water and DX units have been installed. In addition, Vapac humidifiers, commissioned by EWS and Colman floor grilles, louvers and diffusers were also specified and used throughout the building.
Read our case study
(PDF)
Image courtesy of the UK Met Office
Commercial Office Building, Marlborough, MA
Ventrol
®
Custom Air Handlers with FANWALL TECHNOLOGY
®
350,000 ft
2
office building needed upgrade to six aging air handling systems.
Replacement air handlers or fans were too large to fit inside the building.
Solution: Knock-down air handlers with a FANWALL
®
system – 9 FANWALL cubes in the supply unit (55,000 CFM) and 4 cubes in the return unit (33,000 cfm) at 5” TSP.
System delivers lower acoustic levels, increased airflows, and improved airflow through coil and filters.